Software Testing Training by Experts

;

Our Training Process

Software Testing - Syllabus, Fees & Duration

MODULE 1

  • Software development life cycle
  • SDLC development models
  • Water fall model
  • Evolutionary development model
  • Agile model
  • Test driven development
  • Scrum model

MODULE 2

  • Types of automation
  • Unit test, integration, system testing
  • GUL testing, API testing, load testing
  • Smoke /sanity testing importance
  • Regression/ Functional testing

MODULE 3

  • Uses cases for testers
  • Writing good use cases
  • Elevator, mobile, phone, pen, coffee vending machine
  • List of technologies
  • Black box test technology
  • Boundary value analysis
  • Equivalence class partition
  • Error guessing
  • White box test technology
  • Statement coverage
  • Condition coverage
  • Path coverage
  • Branch coverage
  • Types of test cases
  • Positive and negative cases
  • UI test cases
  • Usability test cases
  • Field validation
  • Functional test cases

MODULE 4

  • Test plan document
  • Title
  • Revision history
  • Objective of document
  • Scope of document
  • Objective of testing
  • Metric collection
  • Project description
  • Critical functionality
  • Test data requirement
  • Features not to be used
  • Test environment
  • Training requirements
  • Effort estimation
  • Resource requirement
  • Scheduling
  • Test strategy
  • Input/ entry criteria
  • Exit criteria
  • Test suspension and resumption criteria
  • Test completion criteria
  • Acceptance criteria
  • Bug classification
  • Test deliverables
  • Standards to be followed
  • Risk analysis

MODULE 5

  • Bugs
  • Bug classifications
  • Bug template
  • Bug tracking
  • Bug tracking tools
  • Bug life cycle
  • Statues for bug life cycle

MODULE 6

  • JAVA
  • OO concepts
  • Encapsulation
  • Inheritance
  • Abstract classes, interface, final
  • Polymorphism
  • Overriding, overloading, this, super, constructor
  • General
  • Collection
  • Lists, sets, revise basic algorithms if time permits
  • Exception handling
  • JDBC

MODULE 7

  • Log4J
  • ANT
  • SVN
  • HUDSON
  • JIRA, Bugzilla
  • JUNIT, Test NG
  • Other languages
  • SQL
  • PERL
  • UNIX

MODULE 8

  • Mercury quick test pro
  • Introduction
  • Recording
  • Object repository
  • Standard checkpoints
  • Database checkpoints need to look
  • Parameterization
  • Data drove testing
  • Output values
  • Actions
  • Descriptive programming

MODULE 9

  • Load testing (load runner)
  • Fundamentals of load runner
  • Planning an effective load test
  • Load runner installation
  • Virtual user generator scripting
  • Recording and playback
  • Action and transactions
  • Parameters, checkpoints correlation
  • Advanced correlation
  • Enhance V user output log
  • Error handling
  • Introduction to scenarios
  • Using run-time setting
  • Scenarios execution
  • Scheduling scenarios
  • Performance monitors
  • Result analysis
  • Building effective load test scripts
  • Load runner hand on exercises

MODULE 10

  • Test management tools
  • Adding test requirements
  • Create tests
  • Executing test case manually
  • Analyze project progress
  • Run tests and analyze the results
  • Report and trace defects
  • Document generator
  • Executing test scripts remotely and more
  • The test case with requirements
  • Descriptive programming

MODULE 11

  • Manual testing real project
  • Take a real project and do the following in different phases of the QA lifecycle
  • QA basic
  • Requirement
  • Test plan
  • Sizing
  • Test case
  • Bug lifecycle
  • Log- with log4j
  • Build
  • Boundary value analysis and equivalence partitioning
  • End and end testing
  • Status reporting
  • UAT
  • Production check out

MODULE 12

  • OR
  • SOR
  • Basic of web syntax
  • Descriptive programing
  • Functions
  • Functional library
  • Excel integration
  • Option explicit
  • Loop
  • Original identifier
  • Get TO property
  • Get RO property
  • Showing manual test script
  • Error handling using script
  • Recovery scenario
  • Download Syllabus - Software Testing (Automation)

MODULE 1

  • What is Software testing?
  • Importance of Software testing
  • How to conduct Software testing.
  • Basic terminology of Software testing
  • Manual Testing Process
  • Difference between Manual and Automated Testing
  • Software testing Roles and Responsibilities

MODULE 2

  • Software development life cycle and various SDLC Models
  • Requirements phase
  • Analysis phase
  • Design phase
  • Coding phase
  • Testing phase
  • Release and maintenance phase
  • Software Development life cycle models
  • Waterfall model
  • Drawbacks of waterfall model
  • Spiral model
  • V model
  • Big bang model
  • RAD model
  • Interactive model

MODULE 3

  • Software test design techniques
  • Static test design
  • Informal reviews
  • Walkthroughs
  • Technical review
  • Inspection
  • Dynamic test design
  • White-box testing
  • Black box testing
  • Grey box testing

MODULE 4

  • Testing levels
  • Functional level
  • Unit testing
  • Integration testing
  • System testing
  • Regression testing
  • Acceptance testing
  • Non-functional
  • Performance testing
  • Load testing
  • Security testing
  • Portability testing

MODULE 5

Course Fees
10000+
20+
50+
25+

Software Testing Jobs in Drogheda

Enjoy the demand

Find jobs related to Software Testing in search engines (Google, Bing, Yahoo) and recruitment websites (monsterindia, placementindia, naukri, jobsNEAR.in, indeed.co.in, shine.com etc.) based in Drogheda, chennai and europe countries. You can find many jobs for freshers related to the job positions in Drogheda.

  • Manual tester
  • Software Test Engineer
  • Test engineer
  • Software Testing
  • Software Automation Testing
  • Quality Assurance Engineer
  • Software Manual Tester
  • Software Testing Analyst
  • Quality Engineer
  • Software Tester

Software Testing Internship/Course Details

Software Testing internship jobs in Drogheda
Software Testing This allows users to try a variety of desktop, web, and mobile apps. If you need software automation training in a certain region, NEST SOFT can help you become an expert in software development automation. The testing manual is an activity that necessitates the tester's creativity, open mind, and patience. They have over 15 years of real-world software testing expertise and are certified QA consultants. They have extensive practical and theoretical expertise, as well as experience working on a variety of real-time projects. The goal of the course is not to teach the fundamentals of testing, but to take it to the next level. Although many universities offer software testing automation training and placement, just a handful excel at coaching. There are no environmental constraints with manual testing, and programming experience is not necessary. Manual software testing is simple to learn for new testers. Before their testing may be automated, new apps must be manually tested.

List of All Courses & Internship by TechnoMaster

Success Stories

The enviable salary packages and track record of our previous students are the proof of our excellence. Please go through our students' reviews about our training methods and faculty and compare it to the recorded video classes that most of the other institutes offer. See for yourself how TechnoMaster is truly unique.

List of Training Institutes / Companies in Drogheda

  • FloWebDesign | Location details: Beamore Business Centre, Unit 4 Beamore Rd, Millmount Abbey, Drogheda, Co. Meath, A92 WY26, Ireland | Classification: Website designer, Website designer | Visit Online: flowebdesign.ie | Contact Number (Helpline): +353 46 924 1535
 courses in Drogheda
still, the growth of Drogheda over recent times has meant that the builtup area of Drogheda now stretches beyond the city boundary into Counties Meath and Louth. Stamullen, Donore, Julianstown, Gormanstown, Donacarney, Duleek, Slane, Collon, Monasterboice, Tullyallen, Termonfeckin, Dunleer. 1238. It has seen rapid-fire population growth, and in parallel, significant investment in structure similar as upgrading the BelfastDublin rail line; the appearance of the M1 motorway and the ongoing expansion of the original sanitarium which serves the region. The most effective manner to achieve this status and achieve other benefits and edge is to combine Louth and Meath Local Authorities into one larger reality. 70,09013. Laurence Shopping Centre and the Scotch Hall development at the south docks. Eventually, another concern is that any Ministerial and other comment re Ireland 2040 refers to moving profitable exertion down from Dublin and the Eastern Seaboard. As with domestic development growth during the same period, this expansion is refl ective of recent rapid-fire population growth. Over,000 buses travel in this way through the original vill of Julianstown daily; and Irish Rail state that Drogheda is their busiest station outside Dublin.

Trained more than 10000+ students who trust Nestsoft TechnoMaster

Get Your Personal Trainer